Mobile Hemodialysis Unit
Odulair builds mobile hemodialysis units with AAMI-standard RO water systems, 4–6 stations, and full isolation capability for hospital disaster recovery, ESRD outreach, and temporary dialysis programs.
·UEI LUAKV3T8KSV5
·WOSB · SAM.gov Active
·50-Day Lead Time
·DOT/NHTSA Certified · WMI 1Z9
AAMI-Standard Mobile Dialysis Platform
AAMI/ANSI-standard reverse osmosis water purification · Continuous loop recirculation · Product water conductivity monitoring · Reject water management
4–6 stations · Proportioning system provision · Patient recliner chairs · IV pole · Monitoring provision · Emergency disconnect
Isolated power circuits per station · NFPA 99 medical-grade · Hospital-grade GFCI · 200A service minimum
Airborne infection isolation option · Negative pressure · HEPA filtration for immunocompromised patients
Hospital dialysis unit backup · Hurricane/disaster ESRD continuation · Self-contained 72h power · Rapid deployment
AAMI RD52/RD62 water standards · NFPA 99 · NEC 517 · CMS Conditions of Participation
Frequently Asked Questions
What is a mobile hemodialysis unit?
A mobile hemodialysis unit is a purpose-built truck or trailer equipped with AAMI-standard RO water purification, hemodialysis stations, and isolated power circuits to deliver dialysis treatments at locations outside a fixed dialysis center. Used for hospital disaster backup, ESRD outreach, and rural dialysis access.
How many dialysis stations fit in a mobile unit?
4 stations in the 30ft Hino L7 truck. 6 stations in the 30ft with optimized layout. The 53ft double-expandable trailer accommodates 8–12 stations with full RO water loop and isolation capability. Contact Odulair for your station count requirement.
Does a mobile dialysis unit meet CMS Conditions of Participation?
Odulair mobile dialysis units are built to AAMI RD52/RD62 water standards and NFPA 99 electrical standards — the technical requirements under CMS Conditions of Participation for ESRD facilities. CMS end-stage renal disease facility certification is the responsibility of the operating organization, not the manufacturer.
Request Specifications & Pricing
Odulair LLC · WOSB · CAGE 6L2X9 · Joelton, TN · 50-Day Lead Time
info@odulair.com · Van configurations →